IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,489

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0135 # 04 Y:1999 04 1999 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $413 $1,870 Not Implemented
SD0222 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,813 $4,697 Implemented
SD0222 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,888 $2,790 Not Implemented
SD0222 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,584 $6,000 Not Implemented
SD0222 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,823 $19,600 Not Implemented
SD0222 # 05 Y:1999 05 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $7,799 $11,000 Not Implemented
SD0222 # 06 Y:1999 06 1999 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $24,876 $14,300 Not Implemented
SD0222 # 07 Y:1999 07 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,400 $10,000 Not Implemented
IA0212 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,330 $21,549 Implemented
IA0212 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $279 $372 Implemented
IA0212 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $37 $108 Implemented
IA0212 # 04 Y:1998 04 1998 $199,680 $35,485 Implemented
IA0212 # 05 Y:1998 05 1998 $59,520 $111,000 Implemented
IA0212 # 06 Y:1998 06 1998 ELIMINATE/REDUCE AN OPERATION $24,960 $20,000 Implemented
IA0212 # 07 Y:1998 07 1998 $1,746 $75 Implemented
OD0124 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,935 $6,012 Implemented
OD0124 # 02 Y:1998 02 1998 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $437 $1,290 Not Implemented
OD0124 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,225 $5,625 Not Implemented
OD0124 # 04 Y:1998 04 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,805 $4,595 Not Implemented
KU0505 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,140 $9,600 Implemented
KU0505 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,350 $20 Implemented
KU0505 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $400 Implemented
KU0505 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $720 $340 Implemented
KU0505 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $510 $260 Implemented
KU0505 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $800 $0 Implemented