IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,498

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0594 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,580 $0 Not Implemented
SF0594 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,143 $0 Not Implemented
SF0594 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $38,807 $8,920 Not Implemented
SF0594 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,583 $28,593 Not Implemented
SF0594 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,223 $4,344 Not Implemented
SF0594 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,717 $13,055 Not Implemented
SF0594 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,385 $9,100 Not Implemented
SF0594 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $559 $1,938 Not Implemented
LS2302 # 01 Y:2023 01 2023 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $16,597 $0 Not Implemented
LS2302 # 02 Y:2023 02 2023 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $594 $0 Not Implemented
LS2302 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $2,984 $325 Implemented
LS2302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $819 $90 Not Implemented
LS2302 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $210 $25 Not Implemented
LS2302 # 06 Y:2023 06 2023 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $8,863 $5,000 Not Implemented
LS2302 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,715 $3,600 Not Implemented
LS2302 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,803 $19,030 Implemented
LS2302 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,895 $12,150 Not Implemented
LS2302 # 10 Y:2023 10 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $194 $700 Not Implemented
TR0030 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $13,094 $200,200 Implemented
TR0030 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $133 $195 Implemented
TR0030 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,145 $7,000 Implemented
TR0030 # 04 Y:2022 04 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,744 $7,758 Implemented
LT8368 # 01 Y:2022 01 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,357 $5,022 Not Implemented
LT8368 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $952 $3,400 Not Implemented
LT8368 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $585 $852 Implemented