Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,498
matching recommendationsSIC | 2099 | Food Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0594 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,580 | $0 | Not Implemented |
SF0594 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,143 | $0 | Not Implemented |
SF0594 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $38,807 | $8,920 | Not Implemented |
SF0594 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,583 | $28,593 | Not Implemented |
SF0594 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,223 | $4,344 | Not Implemented |
SF0594 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,717 | $13,055 | Not Implemented |
SF0594 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,385 | $9,100 | Not Implemented |
SF0594 # 08 Y:2023 | 08 | 2023 | INSULATE BARE EQUIPMENT | $559 | $1,938 | Not Implemented |
LS2302 # 01 Y:2023 | 01 | 2023 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $16,597 | $0 | Not Implemented |
LS2302 # 02 Y:2023 | 02 | 2023 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $594 | $0 | Not Implemented |
LS2302 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $2,984 | $325 | Implemented |
LS2302 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $819 | $90 | Not Implemented |
LS2302 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $210 | $25 | Not Implemented |
LS2302 # 06 Y:2023 | 06 | 2023 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $8,863 | $5,000 | Not Implemented |
LS2302 # 07 Y:2023 | 07 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,715 | $3,600 | Not Implemented |
LS2302 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,803 | $19,030 | Implemented |
LS2302 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,895 | $12,150 | Not Implemented |
LS2302 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $194 | $700 | Not Implemented |
TR0030 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,094 | $200,200 | Implemented |
TR0030 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $133 | $195 | Implemented |
TR0030 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,145 | $7,000 | Implemented |
TR0030 # 04 Y:2022 | 04 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,744 | $7,758 | Implemented |
LT8368 # 01 Y:2022 | 01 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,357 | $5,022 | Not Implemented |
LT8368 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $952 | $3,400 | Not Implemented |
LT8368 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $585 | $852 | Implemented |