IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0030 # 04 Y:2022 04 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,744 $7,758 Implemented
TR0030 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,145 $7,000 Implemented
TR0030 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $133 $195 Implemented
TR0030 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $13,094 $200,200 Implemented
TR0008 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $2,128 Implemented
TR0008 # 01 Y:2018 01 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,536 $3,860 Implemented
TR0008 # 04 Y:2018 04 2018 MAINTAIN MACHINES TO REDUCE LEAKS $13,889 $1,000 Implemented
TR0008 # 03 Y:2018 03 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $28,264 $975 Implemented
AM0737 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $710 Implemented
AM0737 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,800 $35,500 Implemented
AM0737 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,210 $3,600 Implemented
AM0737 # 02 Y:2017 02 2017 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $18,400 $0 Implemented
AM0737 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $2,000 Implemented
AM0511 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $18,600 $59,000 Implemented
AM0511 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $150 Implemented
AM0453 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $500 Implemented
AM0453 # 04 Y:2004 04 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $660 $0 Implemented
AM0453 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $370 $250 Implemented
AM0439 # 02 Y:2003 02 2003 $79,200 $1,200 Implemented
AM0439 # 01 Y:2003 01 2003 $910,000 $435,000 Implemented
AM0439 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,400 $1,000 Implemented
AM0439 # 08 Y:2003 08 2003 REPAIR OR REPLACE STEAM TRAPS $7,600 $1,120 Implemented
AM0439 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $4,890 $550 Implemented
AM0439 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,500 $980 Implemented
AM0439 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,290 $1,460 Implemented