Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 2099 | Food Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0126 # 09 Y:2018 | 09 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,864 | $0 | Not Implemented |
WM0126 # 01 Y:2018 | 01 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $95,648 | $66,000 | Not Implemented |
WM0126 # 02 Y:2018 | 02 | 2018 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $26,985 | $20,000 | Not Implemented |
WM0126 # 03 Y:2018 | 03 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,198 | $48,500 | Not Implemented |
WM0126 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,475 | $8,650 | Not Implemented |
WM0126 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,011 | $15,236 | Implemented |
WM0126 # 06 Y:2018 | 06 | 2018 | REPAIR OR REPLACE STEAM TRAPS | $7,154 | $6,480 | Implemented |
WM0126 # 07 Y:2018 | 07 | 2018 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $7,029 | $1,710 | Not Implemented |
WM0126 # 08 Y:2018 | 08 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,101 | $2,850 | Not Implemented |
WI0506 # 07 Y:2006 | 07 | 2006 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $990 | $1,500 | Implemented |
WI0506 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,430 | $0 | Implemented |
WI0506 # 05 Y:2006 | 05 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,795 | $800 | Implemented |
WI0506 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,464 | $1,000 | Implemented |
WI0506 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,464 | $0 | Not Implemented |
WI0506 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,049 | $0 | Implemented |
WI0506 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,973 | $16,740 | Implemented |
WI0481 # 10 Y:2005 | 10 | 2005 | INSULATE BARE EQUIPMENT | $1,933 | $250 | Implemented |
WI0481 # 12 Y:2005 | 12 | 2005 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $700 | $1,700 | Implemented |
WI0481 # 11 Y:2005 | 11 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $547 | $1,200 | Not Implemented |
WI0481 # 09 Y:2005 | 09 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,080 | $500 | Implemented |
WI0481 # 01 Y:2005 | 01 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $220,500 | $28,500 | n/a |
WI0481 # 02 Y:2005 | 02 | 2005 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $187,529 | $126,000 | Not Implemented |
WI0481 # 03 Y:2005 | 03 | 2005 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $30,366 | $8,400 | Not Implemented |
WI0481 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,772 | $32,176 | n/a |
WI0481 # 05 Y:2005 | 05 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $6,480 | $1,410 | Not Implemented |