Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 2099 | Food Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0126 # 06 Y:2018 | 06 | 2018 | REPAIR OR REPLACE STEAM TRAPS | $7,154 | $6,480 | Implemented |
WM0126 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,475 | $8,650 | Not Implemented |
WM0126 # 03 Y:2018 | 03 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,198 | $48,500 | Not Implemented |
WM0126 # 07 Y:2018 | 07 | 2018 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $7,029 | $1,710 | Not Implemented |
WM0126 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,011 | $15,236 | Implemented |
WM0126 # 01 Y:2018 | 01 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $95,648 | $66,000 | Not Implemented |
WM0126 # 02 Y:2018 | 02 | 2018 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $26,985 | $20,000 | Not Implemented |
WM0126 # 09 Y:2018 | 09 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,864 | $0 | Not Implemented |
WM0126 # 08 Y:2018 | 08 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,101 | $2,850 | Not Implemented |
WI0506 # 05 Y:2006 | 05 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,795 | $800 | Implemented |
WI0506 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,464 | $1,000 | Implemented |
WI0506 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,464 | $0 | Not Implemented |
WI0506 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,049 | $0 | Implemented |
WI0506 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,973 | $16,740 | Implemented |
WI0506 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,430 | $0 | Implemented |
WI0506 # 07 Y:2006 | 07 | 2006 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $990 | $1,500 | Implemented |
WI0481 # 06 Y:2005 | 06 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,392 | $1,600 | Not Implemented |
WI0481 # 05 Y:2005 | 05 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $6,480 | $1,410 | Not Implemented |
WI0481 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,772 | $32,176 | n/a |
WI0481 # 09 Y:2005 | 09 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,080 | $500 | Implemented |
WI0481 # 10 Y:2005 | 10 | 2005 | INSULATE BARE EQUIPMENT | $1,933 | $250 | Implemented |
WI0481 # 11 Y:2005 | 11 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $547 | $1,200 | Not Implemented |
WI0481 # 12 Y:2005 | 12 | 2005 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $700 | $1,700 | Implemented |
WI0481 # 03 Y:2005 | 03 | 2005 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $30,366 | $8,400 | Not Implemented |
WI0481 # 02 Y:2005 | 02 | 2005 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $187,529 | $126,000 | Not Implemented |