IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0609 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,370 $60 Not Implemented
CO0609 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $161 $846 Implemented
CO0609 # 04 Y:2007 04 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $580 $4,570 Not Implemented
CO0609 # 05 Y:2007 05 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $1,530 $11,000 Not Implemented
CO0609 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $1,260 $2,160 Not Implemented
CO0609 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,170 $300 Implemented
LE0262 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,332 $2,000 Not Implemented
LE0262 # 15 Y:2007 15 2007 INSTALL OCCUPANCY SENSORS $25,575 $11,250 Not Implemented
LE0262 # 14 Y:2007 14 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,804 $535 Not Implemented
LE0262 # 13 Y:2007 13 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,168 $1,000 Not Implemented
LE0262 # 12 Y:2007 12 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,980 $1,400 Not Implemented
LE0262 # 11 Y:2007 11 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,066 $4,000 Not Implemented
LE0262 # 09 Y:2007 09 2007 INSTALL TIMERS AND/OR THERMOSTATS $9,758 $960 Not Implemented
LE0262 # 07 Y:2007 07 2007 REPAIR OR REPLACE STEAM TRAPS $16,954 $4,200 Not Implemented
LE0262 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,726 $36,000 Not Implemented
LE0262 # 05 Y:2007 05 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $40,484 $1,000 Not Implemented
LE0262 # 04 Y:2007 04 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $118,106 $75,000 Not Implemented
LE0262 # 03 Y:2007 03 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $173,079 $300,000 Not Implemented
LE0262 # 02 Y:2007 02 2007 REPAIR OR REPLACE STEAM TRAPS $427,857 $118,000 Not Implemented
LE0262 # 01 Y:2007 01 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $204,947 $1,684,540 Not Implemented
LE0262 # 08 Y:2007 08 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $13,938 $500 Not Implemented
MI0155 # 10 Y:2007 10 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,610 $3,010 Not Implemented
MI0155 # 09 Y:2007 09 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,909 $180 Not Implemented
MI0155 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,179 $30 Not Implemented
MI0155 # 07 Y:2007 07 2007 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $7,524 $7,800 Not Implemented