IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,938

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0626 # 07 Y:1997 07 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $26,666 $4,200 Implemented
OD0092 # 01 Y:1997 01 1997 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $32,105 $53,256 Implemented
OD0092 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,107 $1,495 Implemented
OD0092 # 03 Y:1997 03 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,578 $6,300 Implemented
OD0092 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $562 $2,705 Implemented
OD0092 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,299 $9,865 Implemented
OD0092 # 06 Y:1997 06 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,500 $4,095 Implemented
HO0161 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,362 $11,311 Implemented
HO0161 # 03 Y:1997 03 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $723 $385 Implemented
HO0161 # 05 Y:1997 05 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $480 $100 Implemented
HO0161 # 07 Y:1997 07 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $12,500 $2,000 Implemented
GT0622 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $980 $2,000 Implemented
GT0622 # 02 Y:1997 02 1997 REPAIR AND ELIMINATE STEAM LEAKS $3,470 $1,200 Implemented
GT0622 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,626 $300 Implemented
GT0622 # 05 Y:1997 05 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,060 $632 Implemented
OD0086 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,489 $2,400 Implemented
OD0086 # 03 Y:1997 03 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,515 $1,500 Implemented
ME0218 # 01 Y:1997 01 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $54,750 $10,120 Implemented
ME0218 # 06 Y:1997 06 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,213 $1,400 Implemented
OK0523 # 02 Y:1997 02 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $65,338 $74,935 Implemented
OK0523 # 04 Y:1997 04 1997 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $72,212 $16,000 Implemented
OK0523 # 05 Y:1997 05 1997 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,478 $6,900 Implemented
OK0523 # 07 Y:1997 07 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,077 $0 Implemented
GT0614 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $590 $7,976 Implemented
GT0614 # 07 Y:1997 07 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,643 $4,500 Implemented