Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1997 |
Principal Product | Textile dyeing and screen printing |
NAICS | n/a |
SIC | 2269 - Finishing Plants, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 103 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 165,604 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $261,030 | 8,703,693 | kWh | $0.03 |
Electricity Demand | $220,416 | 29,467 | kW-months/year | $7.48 |
Natural Gas | $785,704 | 196,572 | MMBtu | $4.00 |
TOTAL ENERGY COSTS | $1,397,064 | |||
RECOMMENDED SAVINGS* | $75,695 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,679 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $25,317 Cost: $11,417 |
$(-201) | (-6,741) | $(-111) | (-13) | $25,629 | 7,139 | - | - |
$(-201) (-6,741) kWh |
$(-111) (-13) kW-months/year |
$25,629 7,139 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $9,492 Cost: $1,000 |
- | - | - | - | $9,492 | 2,647 | - | - |
- - kWh |
- - kW-months/year |
$9,492 2,647 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $132 Cost: $693 |
$85 | 2,931 | $47 | 6 | - | - | - | - |
$85 2,931 kWh |
$47 6 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,287 Cost: $1,678 |
$879 | 29,894 | $408 | 48 | - | - | - | - |
$879 29,894 kWh |
$408 48 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $29,900 Cost: $200 |
- | - | - | - | $29,900 | - | - | - |
- - kWh |
- - kW-months/year |
$29,900 - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4153 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER |
Savings: $8,059 Cost: $25,000 |
- | - | - | - | - | - | $8,059 | 4,950,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,059 4,950,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,508 Cost: $1,500 |
$269 | (-9,086) | $(-150) | (-18) | - | - | $1,389 | 852,218 |
$269 (-9,086) kWh |
$(-150) (-18) kW-months/year |
- - MMBtu |
$1,389 852,218 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $75,695 Cost: $41,488 |
$1,032 | 16,998 | $194 | 23 | $65,021 | 9,786 | $9,448 | 5,802,218 | $1,032 16,998 kWh |
$194 23 kW-months/year |
$65,021 9,786 MMBtu |
$9,448 5,802,218 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,679 Cost: $2,878 |
$879 | 29,894 | $408 | 48 | $39,392 | 2,647 | - | - | $879 29,894 kWh |
$408 48 kW-months/year |
$39,392 2,647 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |