IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0670 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,994 $1,800 Implemented
MA0670 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $3,931 $7,260 Implemented
MA0670 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $11,262 $5,845 Implemented
MA0457 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,317 $2,000 Implemented
MA0457 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,246 $4,225 Implemented
MA0457 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,685 $33,280 Implemented
MA0408 # 08 Y:1998 08 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $27,232 $250,000 Implemented
MA0408 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $644 $513 Implemented
MA0408 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,735 $100 Implemented
MA0408 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,188 $1,000 Implemented
MA0405 # 02 Y:1997 02 1997 MINIMIZE WATER USAGE $25,165 $3,413 Implemented
MA0405 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $1,335 $1,620 Implemented
MA0405 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,177 $28,900 Implemented
MA0388 # 08 Y:1997 08 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $32,204 $55,094 Implemented
MA0388 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,002 $0 Implemented
MA0388 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $604 $272 Implemented
MA0388 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,884 $4,925 Implemented
MA0388 # 01 Y:1997 01 1997 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $95,807 $47,527 Implemented
MA0064 # 06 Y:1986 06 1986 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $12,086 $31,425 Implemented
MA0064 # 05 Y:1986 05 1986 REPAIR OR REPLACE STEAM TRAPS $26,958 $10,450 Implemented
MA0064 # 04 Y:1986 04 1986 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $900 $2,090 Implemented
MA0064 # 03 Y:1986 03 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,162 $8,300 Implemented
MA0064 # 02 Y:1986 02 1986 INSULATE BARE EQUIPMENT $2,040 $2,900 Implemented
MA0039 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $2,276 $703 Implemented
MA0039 # 01 Y:1985 01 1985 REPAIR OR REPLACE STEAM TRAPS $10,926 $455 Implemented