IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0792 # 07 Y:2004 07 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,310 $8,000 Not Implemented
GT0792 # 08 Y:2004 08 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $39,600 $32,100 Not Implemented
GT0777 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,136 $0 Implemented
GT0777 # 02 Y:2004 02 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,877 $800 Implemented
GT0777 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,295 $1,400 Implemented
GT0777 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,122 $10,970 Implemented
GT0777 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,910 $1,000 Implemented
GT0777 # 06 Y:2004 06 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,122 $2,320 Implemented
GT0777 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,878 $81,651 n/a
GT0777 # 08 Y:2004 08 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $13,327 $20,670 n/a
GT0776 # 01 Y:2004 01 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $1,335 $0 n/a
GT0776 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,581 $550 n/a
GT0776 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $330 $83 n/a
GT0776 # 04 Y:2004 04 2004 IMPROVE LUBRICATION PRACTICES $14,283 $0 n/a
GT0776 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,980 $13,020 n/a
GT0776 # 06 Y:2004 06 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $649 $530 n/a
GT0776 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,823 $73,750 n/a
GT0776 # 08 Y:2004 08 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $37,139 $76,240 n/a
GT0776 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,188 $32,362 n/a
GT0776 # 10 Y:2004 10 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,120 $16,200 n/a
GT0776 # 11 Y:2004 11 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,496 $100,000 n/a
GT0767 # 01 Y:2003 01 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,362 $100 Implemented
GT0767 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,500 $1,250 Implemented
GT0767 # 03 Y:2003 03 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $15,699 $2,088 Implemented
GT0767 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $2,317 $298 Not Implemented