IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0513 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $835 $240 Implemented
NC0513 # 10 Y:2014 10 2014 USE PHOTOCELL CONTROLS $47 $80 Not Implemented
NC0513 # 11 Y:2014 11 2014 KEEP BOILER TUBES CLEAN $48,265 $15,000 Implemented
NC0513 # 12 Y:2014 12 2014 REPAIR OR REPLACE STEAM TRAPS $40,007 $6,200 Implemented
NC0513 # 13 Y:2014 13 2014 REPAIR AND ELIMINATE STEAM LEAKS $20,840 $20,000 Implemented
NC0513 # 14 Y:2014 14 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $9,159 $5,600 Not Implemented
NC0513 # 15 Y:2014 15 2014 KEEP BOILER TUBES CLEAN $13,546 $500 Not Implemented
NC0513 # 16 Y:2014 16 2014 INSULATE FEEDWATER TANK $438 $257 Implemented
NC0513 # 17 Y:2014 17 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $20,435 $19,607 Not Implemented
NC0513 # 18 Y:2014 18 2014 RECOVER WASTE HEAT FROM EQUIPMENT $9,375 $37,264 Not Implemented
MA0729 # 01 Y:2014 01 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $25,718 $11,750 Not Implemented
MA0729 # 02 Y:2014 02 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,490 $500 Implemented
MA0729 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,956 $3,300 Implemented
MA0729 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,114 $9,050 Not Implemented
MA0729 # 05 Y:2014 05 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $2,622 $2,690 Not Implemented
MA0729 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,173 $200 Implemented
TT0127 # 01 Y:2014 01 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $34,016 $68,097 Not Implemented
TT0127 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,188 $228,000 Not Implemented
TT0127 # 03 Y:2014 03 2014 INSTALL COMMON HEADER ON COMPRESSORS $5,171 $25 Not Implemented
TT0127 # 04 Y:2014 04 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $600 $25 Implemented
TT0127 # 05 Y:2014 05 2014 DISCONNECT BALLASTS $390 $130 Implemented
NC0510 # 01 Y:2014 01 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $55,430 $1,200 Implemented
NC0510 # 02 Y:2014 02 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $5,472 $4,800 Not Implemented
NC0510 # 03 Y:2014 03 2014 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $1,500 $1,000 Implemented
NC0510 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $39,042 $3,000 Not Implemented