IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0313 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,365 $25,000 Implemented
LE0313 # 02 Y:2011 02 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,529 $16,000 Not Implemented
LE0313 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,031 $960 Implemented
LE0313 # 04 Y:2011 04 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,324 $20,000 Not Implemented
LE0313 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $5,313 $960 Implemented
LE0313 # 06 Y:2011 06 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,587 $105,000 Implemented
LE0313 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,422 $200 Not Implemented
LE0313 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $0 Not Implemented
LE0313 # 09 Y:2011 09 2011 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $559 $315 Implemented
LE0313 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,746 $16,016 Not Implemented
LE0313 # 11 Y:2011 11 2011 INSTALL OCCUPANCY SENSORS $1,827 $2,302 Not Implemented
LE0313 # 12 Y:2011 12 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,016 $1,814 Not Implemented
MI0202 # 01 Y:2011 01 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $24,647 $9,000 Implemented
MI0202 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,531 $62,700 Implemented
MI0202 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,679 $1,320 Implemented
MI0202 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $2,481 $6,700 Not Implemented
MI0202 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,001 $1,980 Not Implemented
MI0202 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,267 $50 Implemented
SD0504 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,200 $12,725 Not Implemented
SD0504 # 02 Y:2010 02 2010 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $188,550 $211,240 Not Implemented
SD0504 # 03 Y:2010 03 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $14,846 $20,000 Not Implemented
SD0504 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,360 $7,010 Not Implemented
SD0504 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,983 $11,585 Not Implemented
GT0876 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,786 $1,500 Implemented
GT0876 # 02 Y:2010 02 2010 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $307 $50 Not Implemented