IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

280

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0282 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $7,098 $1,000 n/a
NC0282 # 02 Y:2004 02 2004 REDESIGN PROCESS $5,960 $6,000 n/a
NC0282 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $99,451 $151,800 n/a
NC0274 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,705 $2,885 Not Implemented
NC0274 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,021 $1,000 Implemented
NC0274 # 04 Y:2003 04 2003 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $9,743 $36,000 Not Implemented
NC0274 # 03 Y:2003 03 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,209 $200 Implemented
NC0274 # 02 Y:2003 02 2003 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $36,152 $81,000 Not Implemented
NC0274 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,125 $77,500 Not Implemented
GT0708 # 01 Y:2001 01 2001 MOVE BOILER TO MORE EFFICIENT LOCATION $7,140 $0 Implemented
GT0708 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,765 $0 Implemented
GT0708 # 03 Y:2001 03 2001 COMBINE UTILITY METERS $11,677 $1,000 Not Implemented
GT0708 # 04 Y:2001 04 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $38,843 $13,500 Implemented
GT0708 # 05 Y:2001 05 2001 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $132,090 $60,000 Not Implemented
GT0708 # 06 Y:2001 06 2001 REPAIR OR REPLACE STEAM TRAPS $9,164 $10,500 Implemented
GT0708 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,650 $21,400 Implemented
NC0090 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,637 $4,850 Not Implemented
NC0090 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,287 $2,679 Not Implemented
NC0090 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,651 $4,538 Not Implemented
NC0090 # 04 Y:1996 04 1996 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $14,811 $2,500 Not Implemented
NC0090 # 05 Y:1996 05 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $225 $100 Not Implemented
NC0098 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,554 $71,700 Not Implemented
NC0098 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,675 $5,094 Not Implemented
NC0098 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,689 $866 Not Implemented
NC0098 # 07 Y:1996 07 1996 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,909 $50 Not Implemented