Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0731 # 03 Y:2002 03 2002 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $3,094 $0 Not Implemented
GT0731 # 04 Y:2002 04 2002 COMBINE UTILITY METERS $5,560 $0 Implemented
GT0731 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,538 $0 Not Implemented
GT0731 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN WATER LINES AND VALVES $140 $330 Implemented
GT0731 # 07 Y:2002 07 2002 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $12,802 $1,500 Not Implemented
GT0731 # 08 Y:2002 08 2002 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $3,265 $2,500 Implemented
GT0731 # 09 Y:2002 09 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,091 $3,500 Implemented
GT0731 # 10 Y:2002 10 2002 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $29,536 $16,300 Not Implemented
GT0731 # 11 Y:2002 11 2002 COVER OPEN TANKS $31,387 $36,639 Not Implemented
GT0731 # 12 Y:2002 12 2002 MODIFY DYE BECK $22,904 $73,150 Not Implemented
GT0731 # 13 Y:2002 13 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $77,662 $80,000 Not Implemented
LE0133 # 01 Y:2002 01 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $78,742 $0 Implemented
LE0133 # 02 Y:2002 02 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $1,298 $6,000 Not Implemented
LE0133 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $983 $0 Implemented
LE0133 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $349 $750 Not Implemented
LE0133 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $750 Implemented
LE0133 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,163 $0 Implemented
WI0409 # 01 Y:2001 01 2001 INSTALL SOLID WASTE INCINERATOR FOR HEAT $34,371 $130,000 Not Implemented
WI0409 # 02 Y:2001 02 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $32,500 $0 Not Implemented
WI0409 # 03 Y:2001 03 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,602 $0 Not Implemented
WI0409 # 04 Y:2001 04 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,314 $4,600 Not Implemented
WI0409 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,301 $0 Not Implemented
WI0409 # 06 Y:2001 06 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,015 $0 Not Implemented
WI0409 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,037 $5,758 Not Implemented
WI0409 # 08 Y:2001 08 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,668 $0 Not Implemented