Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,239
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0412 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,681 | $7,454 | Implemented |
MA0412 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,189 | $9,625 | Not Implemented |
MA0412 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,088 | $323 | Implemented |
MA0412 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,686 | $3,400 | Implemented |
MA0412 # 05 Y:1998 | 05 | 1998 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $925 | $403 | Implemented |
MA0412 # 06 Y:1998 | 06 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $65,920 | $385,000 | Not Implemented |
MA0412 # 07 Y:1998 | 07 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,050 | $7,800 | Not Implemented |
GT0639 # 01 Y:1998 | 01 | 1998 | COMBINE UTILITY METERS | $10,670 | $0 | n/a |
GT0639 # 02 Y:1998 | 02 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,406 | $5,000 | n/a |
GT0639 # 03 Y:1998 | 03 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,573 | $0 | n/a |
GT0639 # 04 Y:1998 | 04 | 1998 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $200,000 | $0 | n/a |
GT0639 # 05 Y:1998 | 05 | 1998 | COVER OPEN TANKS | $66,490 | $87,860 | n/a |
GT0639 # 06 Y:1998 | 06 | 1998 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,600 | $10,500 | n/a |
GT0639 # 07 Y:1998 | 07 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,800 | $1,000 | n/a |
GT0639 # 08 Y:1998 | 08 | 1998 | METER WASTE WATER | $1,180 | $2,350 | n/a |
GT0639 # 09 Y:1998 | 09 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $13,480 | $0 | n/a |
NC0138 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $525 | $1,431 | Not Implemented |
NC0138 # 02 Y:1998 | 02 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $16,312 | $0 | Not Implemented |
NC0138 # 03 Y:1998 | 03 | 1998 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,915 | $0 | Implemented |
NC0138 # 04 Y:1998 | 04 | 1998 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,267 | $0 | Implemented |
NC0138 # 05 Y:1998 | 05 | 1998 | RECOVER AND REUSE COOLING WATER | $1,815 | $1,500 | Not Implemented |
NC0138 # 06 Y:1998 | 06 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $113 | $200 | Not Implemented |
NC0138 # 07 Y:1998 | 07 | 1998 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $754 | $2,500 | Not Implemented |
MA0413 # 01 Y:1998 | 01 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,342 | $53,316 | n/a |
MA0413 # 02 Y:1998 | 02 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,782 | $800 | n/a |