IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0204 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,248 $16,974 Not Implemented
AS0204 # 03 Y:1997 03 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,113 $8,000 Not Implemented
AS0204 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,786 $60 Not Implemented
AS0204 # 05 Y:1997 05 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,579 $0 Not Implemented
AS0204 # 06 Y:1997 06 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,288 $3,115 Not Implemented
AS0204 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,188 $1,381 Not Implemented
AS0204 # 08 Y:1997 08 1997 INSTALL OCCUPANCY SENSORS $696 $1,650 Not Implemented
AS0204 # 09 Y:1997 09 1997 INSTALL TIMERS AND/OR THERMOSTATS $324 $320 Not Implemented
AS0204 # 10 Y:1997 10 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $36,527 $13,260 Not Implemented
AS0204 # 11 Y:1997 11 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $56,857 $66,040 Not Implemented
AS0204 # 12 Y:1997 12 1997 CLEAR AND RENT EXISTING SPACE $9,169 $19,200 Not Implemented
OK0523 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,325 $132,000 Not Implemented
OK0523 # 02 Y:1997 02 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $65,338 $74,935 Implemented
OK0523 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $1,405 $1,188 Not Implemented
OK0523 # 04 Y:1997 04 1997 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $72,212 $16,000 Implemented
OK0523 # 05 Y:1997 05 1997 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,478 $6,900 Implemented
OK0523 # 06 Y:1997 06 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,326 $1,658 Not Implemented
OK0523 # 07 Y:1997 07 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,077 $0 Implemented
GT0614 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $590 $7,976 Implemented
GT0614 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,870 $67,395 Not Implemented
GT0614 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,030 $17,130 Not Implemented
GT0614 # 04 Y:1997 04 1997 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,883 $12,000 Not Implemented
GT0614 # 05 Y:1997 05 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $365,536 $238,000 Not Implemented
GT0614 # 06 Y:1997 06 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $94,300 $40,000 Not Implemented
GT0614 # 07 Y:1997 07 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,643 $4,500 Implemented