IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0742 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,465 $11,685 Implemented
MA0742 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,116 $9,000 Implemented
MA0742 # 08 Y:2015 08 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,024 $11,650 Implemented
MA0742 # 04 Y:2015 04 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,330 $1,000 Not Implemented
MA0742 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $24,583 $5,560 Implemented
MA0742 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,112 $4,285 Not Implemented
MA0742 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $38,357 $25,972 Implemented
MA0742 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $55,652 $120,000 Not Implemented
ME0269 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $11,193 $6,570 Not Implemented
ME0269 # 15 Y:1999 15 1999 MINIMIZE WATER USAGE $229 $100 Implemented
ME0269 # 14 Y:1999 14 1999 RECOVER AND REUSE WASTE MATERIAL $15,270 $0 Not Implemented
ME0269 # 13 Y:1999 13 1999 INSULATE BARE EQUIPMENT $547 $273 Implemented
ME0269 # 12 Y:1999 12 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,273 $1,632 Implemented
ME0269 # 11 Y:1999 11 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,837 $800 Not Implemented
ME0269 # 10 Y:1999 10 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $2,179 $2,000 Implemented
ME0269 # 09 Y:1999 09 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,296 $5,114 Not Implemented
ME0269 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $4,461 $650 Implemented
ME0269 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,202 $10,069 Implemented
ME0269 # 06 Y:1999 06 1999 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $6,530 $21,460 Implemented
ME0269 # 03 Y:1999 03 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $12,357 $32,660 Not Implemented
ME0269 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,299 $10,600 Implemented
ME0269 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,324 $1,000 Implemented
ME0269 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,778 $56,288 Implemented
MA0224 # 03 Y:1991 03 1991 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $25,667 $19,927 Not Implemented
MA0224 # 02 Y:1991 02 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $71,552 $0 Not Implemented