Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
115
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0796 # 04 Y:2004 | 04 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $815 | $500 | Not Implemented |
GT0796 # 03 Y:2004 | 03 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $835 | $0 | Implemented |
GT0796 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $895 | $200 | Implemented |
GT0796 # 01 Y:2004 | 01 | 2004 | COMBINE UTILITY METERS | $4,508 | $9,000 | Not Implemented |
GT0796 # 08 Y:2004 | 08 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $792 | $1,910 | Not Implemented |
GT0796 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,051 | $50,551 | Implemented |
GT0796 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,639 | $9,925 | Not Implemented |
GT0796 # 05 Y:2004 | 05 | 2004 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $8,427 | $1,750 | Not Implemented |
GT0795 # 09 Y:2004 | 09 | 2004 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $18,125 | $6,300 | Not Implemented |
GT0795 # 01 Y:2004 | 01 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $43,709 | $0 | Not Implemented |
GT0795 # 05 Y:2004 | 05 | 2004 | METER WASTE WATER | $7,272 | $0 | Not Implemented |
GT0795 # 07 Y:2004 | 07 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $5,380 | $4,000 | Not Implemented |
GT0795 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $42,201 | $34,000 | Not Implemented |
GT0795 # 08 Y:2004 | 08 | 2004 | DISCONNECT BALLASTS | $1,696 | $3,640 | Not Implemented |
GT0795 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,570 | $2,910 | Not Implemented |
GT0795 # 04 Y:2004 | 04 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,828 | $48,861 | Not Implemented |
GT0795 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,890 | $836 | Not Implemented |
GT0795 # 03 Y:2004 | 03 | 2004 | USE SYNTHETIC LUBRICANT | $30,353 | $0 | Not Implemented |
NC0300 # 01 Y:2004 | 01 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,985 | $1,000 | Not Implemented |
NC0300 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $1,402 | $4,751 | Implemented |
NC0300 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,688 | $6,890 | Not Implemented |
NC0300 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,308 | $100 | Implemented |
NC0300 # 02 Y:2004 | 02 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,558 | $5,000 | Implemented |
GT0792 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,100 | $75,700 | Not Implemented |
GT0792 # 06 Y:2004 | 06 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $41,148 | $96,250 | Not Implemented |