Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 221 | Broadwoven Fabric Mills, Cotton |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0921 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $947 | $3,500 | Implemented |
GT0842 # 07 Y:2007 | 07 | 2007 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $63,520 | $7,000 | Implemented |
GT0842 # 06 Y:2007 | 06 | 2007 | USE WATER-BASED ADHESIVES | $1,960 | $0 | Implemented |
GT0842 # 05 Y:2007 | 05 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,090 | $3,900 | Implemented |
GT0842 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,980 | $1,603 | Implemented |
GT0819 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,030 | $4,800 | Implemented |
GT0819 # 05 Y:2006 | 05 | 2006 | USE EXISTING DAM TO GENERATE ELECTRICITY | $106,850 | $94,000 | Implemented |
GT0819 # 04 Y:2006 | 04 | 2006 | DISCONNECT BALLASTS | $2,735 | $3,678 | Implemented |
GT0819 # 03 Y:2006 | 03 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $18,798 | $5,000 | Implemented |
GT0819 # 01 Y:2006 | 01 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $140,000 | $10,000 | Implemented |
GT0767 # 01 Y:2003 | 01 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $2,362 | $100 | Implemented |
GT0767 # 03 Y:2003 | 03 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $15,699 | $2,088 | Implemented |
GT0767 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,500 | $1,250 | Implemented |
GT0766 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,159 | $6,250 | Implemented |
GT0766 # 08 Y:2003 | 08 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,589 | $49,906 | Implemented |
GT0766 # 05 Y:2003 | 05 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $5,000 | $1,000 | Implemented |
GT0766 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $32,869 | $500 | Implemented |
GT0705 # 03 Y:2000 | 03 | 2000 | MINIMIZE WATER USAGE | $1,457 | $300 | Implemented |
GT0705 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,420 | $0 | Implemented |
GT0573 # 03 Y:1995 | 03 | 1995 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,950 | $6,270 | Implemented |
GT0373 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,521 | $4,413 | Implemented |
GT0373 # 02 Y:1989 | 02 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $670 | $3,438 | Implemented |
GT0373 # 04 Y:1989 | 04 | 1989 | IMPROVE LUBRICATION PRACTICES | $550 | $0 | Implemented |
GT0366 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,640 | $2,652 | Implemented |
GT0366 # 07 Y:1989 | 07 | 1989 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $13,600 | $15,000 | Implemented |