Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 222 | Broadwoven Fabric Mills, Manmade |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CL2105 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $69,993 | $55,908 | Implemented |
CL2105 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $25,163 | $8,200 | Implemented |
CL2105 # 03 Y:2021 | 03 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $34,939 | $1,120 | Not Implemented |
CL2105 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,819 | $2,100 | Implemented |
CL2105 # 05 Y:2021 | 05 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $567,975 | $4,358,847 | Not Implemented |
CL2105 # 06 Y:2021 | 06 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $63 | $0 | Implemented |
CL2105 # 07 Y:2021 | 07 | 2021 | USE OPTIMUM TEMPERATURE | $81,375 | $0 | Not Implemented |
CL2105 # 08 Y:2021 | 08 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $25,046 | $7,102 | Not Implemented |
CL2105 # 09 Y:2021 | 09 | 2021 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $24,497 | $17,450 | Not Implemented |
CL2105 # 10 Y:2021 | 10 | 2021 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $2,591 | $600 | Implemented |
CL2105 # 11 Y:2021 | 11 | 2021 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $982 | $3,050 | Not Implemented |
NC0613 # 09 Y:2018 | 09 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $2,479 | $5,865 | Implemented |
NC0613 # 05 Y:2018 | 05 | 2018 | RECOVER AND REUSE COOLING WATER | $6,422 | $1,500 | Not Implemented |
NC0613 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,956 | $81,978 | Implemented |
NC0613 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $698 | $5,976 | Implemented |
NC0613 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,628 | $200 | Implemented |
NC0613 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,751 | $2,700 | Not Implemented |
NC0613 # 07 Y:2018 | 07 | 2018 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $27,242 | $500 | Not Implemented |
NC0613 # 06 Y:2018 | 06 | 2018 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,218 | $500 | Not Implemented |
NC0613 # 08 Y:2018 | 08 | 2018 | INSTALL SPECTRAL REFLECTORS / DELAMP | $914 | $1,700 | Implemented |
NC0138 # 04 Y:1998 | 04 | 1998 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,267 | $0 | Implemented |
NC0138 # 06 Y:1998 | 06 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $113 | $200 | Not Implemented |
NC0138 # 07 Y:1998 | 07 | 1998 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $754 | $2,500 | Not Implemented |
NC0138 # 03 Y:1998 | 03 | 1998 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,915 | $0 | Implemented |
NC0138 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $525 | $1,431 | Not Implemented |