Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 2221 | Broadwoven Fabric Mills, Manmade |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0092 # 07 Y:1997 | 07 | 1997 | INSTALL SOLID WASTE INCINERATOR FOR HEAT | $44,642 | $16,696 | Not Implemented |
OD0092 # 06 Y:1997 | 06 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $10,500 | $4,095 | Implemented |
OD0092 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,299 | $9,865 | Implemented |
OD0092 # 04 Y:1997 | 04 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $562 | $2,705 | Implemented |
OD0092 # 03 Y:1997 | 03 | 1997 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,578 | $6,300 | Implemented |
OD0092 # 02 Y:1997 | 02 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,107 | $1,495 | Implemented |
OD0092 # 01 Y:1997 | 01 | 1997 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $32,105 | $53,256 | Implemented |
ME0208 # 02 Y:1997 | 02 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,766 | $20 | Implemented |
ME0208 # 10 Y:1997 | 10 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $143 | $400 | Implemented |
ME0208 # 08 Y:1997 | 08 | 1997 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $354 | $0 | Not Implemented |
ME0208 # 07 Y:1997 | 07 | 1997 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $452 | $0 | Implemented |
ME0208 # 06 Y:1997 | 06 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $738 | $200 | Not Implemented |
ME0208 # 05 Y:1997 | 05 | 1997 | USE OPTIMUM THICKNESS INSULATION | $788 | $290 | Implemented |
ME0208 # 04 Y:1997 | 04 | 1997 | PAY UTILITY BILLS ON TIME | $1,220 | $0 | Implemented |
ME0208 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,949 | $3,274 | Not Implemented |
ME0208 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,030 | $600 | Implemented |
ME0208 # 09 Y:1997 | 09 | 1997 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $24,276 | $6,900 | Implemented |
TN0598 # 09 Y:1997 | 09 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,196 | $4,750 | n/a |
TN0598 # 08 Y:1997 | 08 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,530 | $9,800 | n/a |
TN0598 # 07 Y:1997 | 07 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,900 | $0 | n/a |
TN0598 # 06 Y:1997 | 06 | 1997 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,685 | $13,600 | n/a |
TN0598 # 05 Y:1997 | 05 | 1997 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $30,661 | $92,600 | n/a |
TN0598 # 04 Y:1997 | 04 | 1997 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $33,035 | $13,000 | n/a |
TN0598 # 03 Y:1997 | 03 | 1997 | MODIFY CURRENT INCENTIVE PROGRAM | $59,900 | $10,000 | n/a |
TN0598 # 02 Y:1997 | 02 | 1997 | RECOVER AND REUSE WASTE MATERIAL | $95,500 | $12,800 | n/a |