Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
104
matching recommendationsSIC | 224 | Narrow Fabric Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0126 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,474 | $0 | Implemented |
MI0126 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,617 | $16,000 | Implemented |
MI0126 # 02 Y:2006 | 02 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,323 | $1,020 | Implemented |
MI0126 # 06 Y:2006 | 06 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $42,242 | $140 | Implemented |
MI0126 # 03 Y:2006 | 03 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,331 | $212 | Implemented |
MI0126 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,497 | $1,750 | Implemented |
MA0547 # 11 Y:2004 | 11 | 2004 | ADD AREA LIGHTING SWITCHES | $1,964 | $2,400 | Not Implemented |
MA0547 # 13 Y:2004 | 13 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $349 | $1,400 | Not Implemented |
MA0547 # 12 Y:2004 | 12 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,376 | $825 | Not Implemented |
MA0547 # 09 Y:2004 | 09 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,321 | $10,950 | Not Implemented |
MA0547 # 06 Y:2004 | 06 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $14,705 | $4,020 | Not Implemented |
MA0547 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,117 | $6,600 | Not Implemented |
MA0547 # 05 Y:2004 | 05 | 2004 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $14,711 | $44,000 | Not Implemented |
MA0547 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,463 | $78,000 | Not Implemented |
MA0547 # 03 Y:2004 | 03 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $43,010 | $24,670 | Not Implemented |
MA0547 # 02 Y:2004 | 02 | 2004 | USE EXISTING DAM TO GENERATE ELECTRICITY | $50,195 | $210,000 | Not Implemented |
MA0547 # 10 Y:2004 | 10 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,829 | $7,475 | Not Implemented |
MA0547 # 07 Y:2004 | 07 | 2004 | USE MINIMUM STEAM OPERATING PRESSURE | $13,419 | $0 | Not Implemented |
MA0547 # 01 Y:2004 | 01 | 2004 | CLEAR AND RENT EXISTING SPACE | $200,000 | $398,000 | Not Implemented |
NC0243 # 05 Y:2002 | 05 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $4,291 | $2,500 | Implemented |
NC0243 # 01 Y:2002 | 01 | 2002 | INSULATE BARE EQUIPMENT | $1,453 | $3,876 | Not Implemented |
NC0243 # 02 Y:2002 | 02 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,063 | $1,500 | Not Implemented |
NC0243 # 04 Y:2002 | 04 | 2002 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $1,543 | $6,300 | Implemented |
NC0243 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $200 | $125 | Not Implemented |
NC0243 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $236 | $50 | Implemented |