IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143

matching recommendations
Reset
SIC 2241 Narrow Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0670 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,994 $1,800 Implemented
MA0670 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $3,931 $7,260 Implemented
LE0313 # 12 Y:2011 12 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,016 $1,814 Not Implemented
LE0313 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,031 $960 Implemented
LE0313 # 11 Y:2011 11 2011 INSTALL OCCUPANCY SENSORS $1,827 $2,302 Not Implemented
LE0313 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,746 $16,016 Not Implemented
LE0313 # 09 Y:2011 09 2011 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $559 $315 Implemented
LE0313 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $0 Not Implemented
LE0313 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,422 $200 Not Implemented
LE0313 # 06 Y:2011 06 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,587 $105,000 Implemented
LE0313 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $5,313 $960 Implemented
LE0313 # 04 Y:2011 04 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,324 $20,000 Not Implemented
LE0313 # 02 Y:2011 02 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,529 $16,000 Not Implemented
LE0313 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,365 $25,000 Implemented
MI0126 # 03 Y:2006 03 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,331 $212 Implemented
MI0126 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,617 $16,000 Implemented
MI0126 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,474 $0 Implemented
MI0126 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,497 $1,750 Implemented
MI0126 # 06 Y:2006 06 2006 $42,242 $140 Implemented
MI0126 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $8,323 $1,020 Implemented
MA0547 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $43,010 $24,670 Not Implemented
MA0547 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,117 $6,600 Not Implemented
MA0547 # 05 Y:2004 05 2004 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $14,711 $44,000 Not Implemented
MA0547 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,463 $78,000 Not Implemented
MA0547 # 01 Y:2004 01 2004 $200,000 $398,000 Not Implemented