Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
237
matching recommendationsSIC | 225 | Knitting Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0666 # 02 Y:2021 | 02 | 2021 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $24,876 | $50,000 | n/a |
NC0666 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,259 | $50 | n/a |
NC0666 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,200 | $51,808 | n/a |
NC0666 # 04 Y:2021 | 04 | 2021 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,768 | $10,000 | n/a |
NC0595 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $910 | $2,000 | Not Implemented |
NC0595 # 03 Y:2017 | 03 | 2017 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $375 | $552 | Implemented |
NC0595 # 04 Y:2017 | 04 | 2017 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $3,516 | $400 | Implemented |
NC0595 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $896 | $100 | Implemented |
NC0595 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,435 | $144,553 | Not Implemented |
NC0547 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,570 | $50,000 | Not Implemented |
NC0547 # 06 Y:2015 | 06 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $2,433 | $11,840 | Implemented |
NC0547 # 07 Y:2015 | 07 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $883 | $500 | Not Implemented |
NC0547 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $675 | $1,800 | Not Implemented |
NC0547 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,024 | $100 | Not Implemented |
NC0547 # 10 Y:2015 | 10 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $2,028 | $4,256 | Implemented |
NC0547 # 13 Y:2015 | 13 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $675 | $200 | Implemented |
NC0547 # 09 Y:2015 | 09 | 2015 | REDESIGN PROCESS | $461 | $2,000 | Not Implemented |
NC0547 # 11 Y:2015 | 11 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,688 | $281 | Implemented |
NC0547 # 05 Y:2015 | 05 | 2015 | INSULATE BARE EQUIPMENT | $3,947 | $2,800 | Implemented |
NC0547 # 12 Y:2015 | 12 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $231 | $1,000 | Implemented |
NC0547 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $88 | $100 | Not Implemented |
NC0547 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,425 | $100 | Implemented |
NC0505 # 07 Y:2014 | 07 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,993 | $319 | Implemented |
NC0505 # 05 Y:2014 | 05 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $1,108 | $100 | Implemented |
NC0505 # 06 Y:2014 | 06 | 2014 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,874 | $200 | Implemented |