Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 2259 | Knitting Mills, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0014 # 02 Y:2023 | 02 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,788 | $800 | n/a |
CC0014 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,768 | $1,000 | n/a |
CC0014 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,527 | $2,000 | n/a |
CC0014 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $41,841 | $26,106 | n/a |
CC0014 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,695 | $11,000 | n/a |
CC0014 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,932 | $53,322 | n/a |
CC0014 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,512 | $1,000 | n/a |
NC0353 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,055 | $712 | Implemented |
NC0353 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,078 | $20,770 | Implemented |
NC0353 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $654 | $100 | Implemented |
NC0353 # 04 Y:2007 | 04 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,308 | $2,000 | Implemented |
NC0353 # 03 Y:2007 | 03 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $3,562 | $3,000 | Implemented |
NC0353 # 02 Y:2007 | 02 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,457 | $1,526 | Implemented |
NC0353 # 01 Y:2007 | 01 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $17,011 | $10,953 | Implemented |
MA0534 # 08 Y:2003 | 08 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,663 | $9,742 | Not Implemented |
MA0534 # 09 Y:2003 | 09 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $470 | $1,416 | Not Implemented |
MA0534 # 07 Y:2003 | 07 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,624 | $21,000 | Not Implemented |
MA0534 # 06 Y:2003 | 06 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,591 | $8,425 | Not Implemented |
MA0534 # 05 Y:2003 | 05 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $19,634 | $12,975 | Not Implemented |
MA0534 # 04 Y:2003 | 04 | 2003 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $20,457 | $67,665 | Not Implemented |
MA0534 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,487 | $53,950 | Not Implemented |
MA0534 # 02 Y:2003 | 02 | 2003 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $76,320 | $57,480 | Not Implemented |
MA0534 # 01 Y:2003 | 01 | 2003 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $223,213 | $1,257,060 | Not Implemented |
NC0177 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $434 | $120 | Implemented |
NC0177 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,366 | $2,141 | Implemented |