Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsSIC | 226 | Textile Finishing, Except Wool |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0821 # 04 Y:2020 | 04 | 2020 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $490 | $1,785 | Not Implemented |
MA0821 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $997 | $1,400 | Not Implemented |
MA0821 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,991 | $23,275 | Not Implemented |
MA0821 # 01 Y:2020 | 01 | 2020 | USE MINIMUM SAFE OVEN VENTILATION | $48,924 | $61,470 | Not Implemented |
MA0766 # 01 Y:2016 | 01 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,264 | $57,500 | Not Implemented |
MA0766 # 06 Y:2016 | 06 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,894 | $2,462 | Implemented |
MA0766 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,210 | $50,500 | Implemented |
MA0766 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,247 | $8,325 | Not Implemented |
MA0766 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,571 | $1,000 | Not Implemented |
MA0766 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,855 | $2,000 | Implemented |
MA0729 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,956 | $3,300 | Implemented |
MA0729 # 02 Y:2014 | 02 | 2014 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $14,490 | $500 | Implemented |
MA0729 # 01 Y:2014 | 01 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $25,718 | $11,750 | Not Implemented |
MA0729 # 04 Y:2014 | 04 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,114 | $9,050 | Not Implemented |
MA0729 # 05 Y:2014 | 05 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,622 | $2,690 | Not Implemented |
MA0729 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,173 | $200 | Implemented |
MAS033 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,549 | $7,500 | Implemented |
MAS033 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $762 | $3,450 | Not Implemented |
MAS033 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $1,224 | $730 | Not Implemented |
MAS033 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,256 | $34,000 | Not Implemented |
MA0653 # 01 Y:2009 | 01 | 2009 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $110,550 | $270,000 | Not Implemented |
MA0653 # 02 Y:2009 | 02 | 2009 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $37,210 | $68,000 | Not Implemented |
MA0653 # 03 Y:2009 | 03 | 2009 | REDUCE VENTILATION AIR | $16,188 | $752 | Implemented |
MA0653 # 04 Y:2009 | 04 | 2009 | CLOSE OFF UNNEEDED STEAM LINES | $3,551 | $500 | Not Implemented |
MA0653 # 05 Y:2009 | 05 | 2009 | INSULATE BARE EQUIPMENT | $2,840 | $7,510 | Implemented |