Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 2261 | Finishing Plants, Cotton |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0766 # 06 Y:2016 | 06 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,894 | $2,462 | Implemented |
MA0766 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,855 | $2,000 | Implemented |
MA0766 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,247 | $8,325 | Not Implemented |
MA0766 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,571 | $1,000 | Not Implemented |
MA0766 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,210 | $50,500 | Implemented |
MA0766 # 01 Y:2016 | 01 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,264 | $57,500 | Not Implemented |
MA0729 # 01 Y:2014 | 01 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $25,718 | $11,750 | Not Implemented |
MA0729 # 02 Y:2014 | 02 | 2014 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $14,490 | $500 | Implemented |
MA0729 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,956 | $3,300 | Implemented |
MA0729 # 04 Y:2014 | 04 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,114 | $9,050 | Not Implemented |
MA0729 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,173 | $200 | Implemented |
MA0729 # 05 Y:2014 | 05 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,622 | $2,690 | Not Implemented |
MAS033 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $762 | $3,450 | Not Implemented |
MAS033 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,549 | $7,500 | Implemented |
MAS033 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,256 | $34,000 | Not Implemented |
MAS033 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $1,224 | $730 | Not Implemented |
MA0653 # 03 Y:2009 | 03 | 2009 | REDUCE VENTILATION AIR | $16,188 | $752 | Implemented |
MA0653 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,375 | $6,125 | Not Implemented |
MA0653 # 05 Y:2009 | 05 | 2009 | INSULATE BARE EQUIPMENT | $2,840 | $7,510 | Implemented |
MA0653 # 04 Y:2009 | 04 | 2009 | CLOSE OFF UNNEEDED STEAM LINES | $3,551 | $500 | Not Implemented |
MA0653 # 02 Y:2009 | 02 | 2009 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $37,210 | $68,000 | Not Implemented |
MA0653 # 01 Y:2009 | 01 | 2009 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $110,550 | $270,000 | Not Implemented |
MA0516 # 03 Y:2002 | 03 | 2002 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $14,155 | $19,000 | Not Implemented |
MA0516 # 01 Y:2002 | 01 | 2002 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $151,365 | $135,000 | Implemented |
MA0516 # 02 Y:2002 | 02 | 2002 | MINIMIZE WATER USAGE | $43,582 | $43,100 | Not Implemented |