IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 2262 Finishing Plants, Manmade
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0658 # 04 Y:2020 04 2020 REPLACE TREATED WATER WITH WELL / SURFACE WATER $92,941 $500 n/a
NC0658 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,619 $5,000 n/a
NC0658 # 02 Y:2020 02 2020 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $23,051 $15,000 n/a
NC0658 # 01 Y:2020 01 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,055 $3,000 n/a
NC0658 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,952 $4,258 n/a
NC0658 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $170 $400 n/a
NC0499 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,040 $12,800 Implemented
NC0499 # 08 Y:2013 08 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,104 $200 Not Implemented
NC0499 # 06 Y:2013 06 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,539 $1,165 Not Implemented
NC0499 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $3,164 $1,617 Not Implemented
NC0499 # 01 Y:2013 01 2013 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $52,036 $15,000 Implemented
NC0499 # 02 Y:2013 02 2013 OPERATE BOILERS ON HIGH FIRE SETTING $17,607 $1,000 Implemented
NC0499 # 04 Y:2013 04 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $10,670 $35,000 Not Implemented
NC0499 # 11 Y:2013 11 2013 INSTALL OCCUPANCY SENSORS $3,113 $3,202 Not Implemented
NC0499 # 13 Y:2013 13 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,510 $100 Implemented
NC0499 # 03 Y:2013 03 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,043 $0 Not Implemented
NC0499 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,448 $18,119 Implemented
NC0499 # 12 Y:2013 12 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,194 $451 Implemented
NC0499 # 14 Y:2013 14 2013 DEVELOP A REPAIR/REPLACE POLICY $2,055 $4,256 Implemented
NC0499 # 07 Y:2013 07 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,306 $1,750 Implemented
GT0504 # 02 Y:1993 02 1993 REPAIR AND ELIMINATE STEAM LEAKS $3,240 $400 Implemented
GT0504 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $790 $600 Implemented
GT0504 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,900 $11,430 Implemented
GT0504 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $5,760 Not Implemented
GT0504 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,290 $500 Implemented