IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

642

matching recommendations
Reset
SIC 228 Yarn And Thread Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0271 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,200 $5,000 Implemented
MA0039 # 01 Y:1985 01 1985 REPAIR OR REPLACE STEAM TRAPS $10,926 $455 Implemented
MA0039 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $2,276 $703 Implemented
MA0039 # 03 Y:1985 03 1985 INCREASE AMOUNT OF CONDENSATE RETURNED $942 $1,016 Not Implemented
MA0039 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,180 $931 Not Implemented
MA0039 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,974 $2,113 Not Implemented
MA0034 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $944 $325 Implemented
MA0034 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $4,879 $470 Not Implemented
MA0034 # 03 Y:1985 03 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $44,783 $14,362 Not Implemented
MA0034 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,809 $43,813 Not Implemented
MA0034 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $203 $161 Not Implemented
MA0034 # 06 Y:1985 06 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,025 $1,040 Not Implemented
TN0259 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $31,022 $59,300 Not Implemented
TN0259 # 02 Y:1985 02 1985 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $13,198 $565 Implemented
TN0259 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,946 $1,000 Not Implemented
TN0259 # 04 Y:1985 04 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,582 $0 Implemented
TN0259 # 05 Y:1985 05 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $997 $108 Implemented
TN0259 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $426 $220 Not Implemented
GT0252 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,225 $500 Implemented
GT0252 # 02 Y:1985 02 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $9,800 $41,660 Not Implemented
GT0252 # 03 Y:1985 03 1985 KEEP BOILER TUBES CLEAN $3,730 $5,000 Implemented
GT0252 # 04 Y:1985 04 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,283 $2,928 Implemented
GT0252 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,220 $4,800 Implemented
GT0252 # 06 Y:1985 06 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,490 $0 Implemented
GT0252 # 07 Y:1985 07 1985 RECOVER WASTE HEAT FROM EQUIPMENT $12,650 $10,000 Not Implemented