IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

301

matching recommendations
Reset
SIC 228 Yarn And Thread Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0776 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $330 $83 n/a
GT0776 # 04 Y:2004 04 2004 IMPROVE LUBRICATION PRACTICES $14,283 $0 n/a
GT0776 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,980 $13,020 n/a
GT0776 # 11 Y:2004 11 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,496 $100,000 n/a
GT0776 # 10 Y:2004 10 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,120 $16,200 n/a
GT0776 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,188 $32,362 n/a
GT0776 # 08 Y:2004 08 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $37,139 $76,240 n/a
GT0776 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,823 $73,750 n/a
GT0776 # 06 Y:2004 06 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $649 $530 n/a
GT0757 # 02 Y:2003 02 2003 USE SYNTHETIC LUBRICANT $12,742 $0 Implemented
GT0757 # 03 Y:2003 03 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,064 $948 Implemented
GT0757 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $830 $773 Implemented
GT0757 # 05 Y:2003 05 2003 METER WASTE WATER $8,405 $1,932 Not Implemented
GT0757 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,944 $3,598 Implemented
GT0757 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $1,068 Implemented
GT0757 # 08 Y:2003 08 2003 UPGRADE CONTROLS ON COMPRESSORS $10,106 $20,000 Not Implemented
GT0757 # 09 Y:2003 09 2003 PAY UTILITY BILLS ON TIME $3,198 $0 Implemented
GT0757 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $450 Implemented
GT0739 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,592 $1,900 Implemented
GT0739 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $658 $500 Implemented
GT0739 # 07 Y:2002 07 2002 UPGRADE CONTROLS ON COMPRESSORS $3,488 $0 Implemented
GT0739 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,130 $7,000 Not Implemented
GT0739 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186 $16,560 Not Implemented
GT0739 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,700 $300 Implemented
GT0739 # 01 Y:2002 01 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $19,440 $122,500 Not Implemented