Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
472
matching recommendationsSIC | 2281 | Yarn Spinning Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0529 # 03 Y:1994 | 03 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,040 | $1,350 | Not Implemented |
GT0529 # 04 Y:1994 | 04 | 1994 | ISOLATE HOT OR COLD EQUIPMENT | $430 | $800 | Not Implemented |
GT0529 # 05 Y:1994 | 05 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,600 | $74,700 | Not Implemented |
GT0529 # 06 Y:1994 | 06 | 1994 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $22,900 | $4,000 | Implemented |
GT0529 # 07 Y:1994 | 07 | 1994 | OPERATE BOILERS ON HIGH FIRE SETTING | $12,370 | $0 | Not Implemented |
GT0529 # 08 Y:1994 | 08 | 1994 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,950 | $26,000 | Not Implemented |
GT0521 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,060 | $21,660 | Implemented |
GT0521 # 02 Y:1994 | 02 | 1994 | DISCONNECT BALLASTS | $360 | $640 | Implemented |
GT0521 # 03 Y:1994 | 03 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,620 | $17,130 | Implemented |
GT0521 # 04 Y:1994 | 04 | 1994 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $580 | $1,920 | Not Implemented |
GT0521 # 05 Y:1994 | 05 | 1994 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $6,070 | $4,600 | Not Implemented |
GT0521 # 06 Y:1994 | 06 | 1994 | USE MINIMUM STEAM OPERATING PRESSURE | $200 | $0 | Implemented |
GT0521 # 07 Y:1994 | 07 | 1994 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,770 | $13,000 | Not Implemented |
GT0521 # 08 Y:1994 | 08 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $890 | $900 | Implemented |
GT0521 # 09 Y:1994 | 09 | 1994 | REPAIR AND ELIMINATE STEAM LEAKS | $11,670 | $700 | Implemented |
GT0515 # 01 Y:1993 | 01 | 1993 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,130 | $9,570 | Not Implemented |
GT0515 # 02 Y:1993 | 02 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,090 | $0 | Not Implemented |
GT0515 # 03 Y:1993 | 03 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $680 | $500 | Implemented |
GT0515 # 04 Y:1993 | 04 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,260 | $14,500 | Not Implemented |
GT0515 # 05 Y:1993 | 05 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,620 | $100,640 | Not Implemented |
GT0515 # 06 Y:1993 | 06 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $45,330 | $32,700 | Not Implemented |
GT0515 # 07 Y:1993 | 07 | 1993 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $8,650 | $6,560 | Not Implemented |
GT0515 # 08 Y:1993 | 08 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,820 | $80,090 | Implemented |
GT0427 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,000 | $3,987 | Implemented |
GT0427 # 02 Y:1991 | 02 | 1991 | IMPROVE LUBRICATION PRACTICES | $1,060 | $0 | Implemented |