IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 2282 Throwing And Winding Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0739 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $658 $500 Implemented
GT0739 # 07 Y:2002 07 2002 UPGRADE CONTROLS ON COMPRESSORS $3,488 $0 Implemented
HO0161 # 07 Y:1997 07 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $12,500 $2,000 Implemented
HO0161 # 02 Y:1997 02 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,635 $1,878 Not Implemented
HO0161 # 03 Y:1997 03 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $723 $385 Implemented
HO0161 # 05 Y:1997 05 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $480 $100 Implemented
HO0161 # 06 Y:1997 06 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,130 $100 Not Implemented
HO0161 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,362 $11,311 Implemented
HO0161 # 04 Y:1997 04 1997 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $4,370 $5,000 Not Implemented
OD0067 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,526 $7,365 Not Implemented
OD0067 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,202 $400 Implemented
OD0067 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $789 $887 Not Implemented
OD0067 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $34,085 $5,100 Not Implemented
OD0067 # 05 Y:1996 05 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $2,106 $0 Not Implemented
HO0136 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,736 $6,500 Implemented
HO0136 # 04 Y:1996 04 1996 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $47,059 $145,000 Implemented
HO0136 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $325 $1,302 Not Implemented
HO0136 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $96 $200 Implemented
HO0136 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $211 $905 Implemented
OD0060 # 03 Y:1996 03 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,604 $1,495 n/a
OD0060 # 04 Y:1996 04 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $130 $0 n/a
OD0060 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,887 $8,091 n/a
OD0060 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,032 $5,275 n/a
ME0112 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $1,935 $3,500 Not Implemented
ME0112 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $408 $5,780 Not Implemented