Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
436
matching recommendationsSIC | 229 | Miscellaneous Textile Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0583 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $210 | $10 | Implemented |
AM0583 # 05 Y:2010 | 05 | 2010 | PAY UTILITY BILLS ON TIME | $479 | $0 | Implemented |
NC0407 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,776 | $6,897 | Implemented |
NC0407 # 04 Y:2010 | 04 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,147 | $42,000 | Implemented |
NC0407 # 03 Y:2010 | 03 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,606 | $1,000 | Implemented |
NC0407 # 01 Y:2010 | 01 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,128 | $60,000 | Implemented |
OK0784 # 09 Y:2009 | 09 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $858 | $990 | Implemented |
OK0784 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,788 | $0 | Implemented |
OK0784 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,104 | $0 | Implemented |
OK0784 # 01 Y:2009 | 01 | 2009 | INSULATE BARE EQUIPMENT | $32,802 | $10,627 | Implemented |
OK0784 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $26,522 | $23,859 | Implemented |
LE0291 # 03 Y:2009 | 03 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,557 | $2,500 | Implemented |
LE0291 # 04 Y:2009 | 04 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,457 | $1,120 | Implemented |
LE0291 # 08 Y:2009 | 08 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,836 | $560 | Implemented |
UF0422 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,614 | $1,161 | Implemented |
UF0422 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,882 | $26,728 | Implemented |
UF0422 # 05 Y:2009 | 05 | 2009 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,761 | $0 | Implemented |
UF0422 # 03 Y:2009 | 03 | 2009 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $9,291 | $261 | Implemented |
MA0641 # 03 Y:2008 | 03 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,028 | $3,000 | Implemented |
TT0018 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,809 | $22,423 | Implemented |
TT0018 # 02 Y:2008 | 02 | 2008 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $33,000 | $1,000 | Implemented |
TT0018 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,637 | $5,950 | Implemented |
MZ0015 # 01 Y:2007 | 01 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,790 | $900 | Implemented |
MZ0015 # 02 Y:2007 | 02 | 2007 | INSTALL OCCUPANCY SENSORS | $376 | $180 | Implemented |
MZ0014 # 01 Y:2007 | 01 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $240 | $1,020 | Implemented |