IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

436

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0238 # 11 Y:2002 11 2002 DEVELOP A REPAIR/REPLACE POLICY $6,185 $17,736 Implemented
NC0238 # 12 Y:2002 12 2002 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $4,536 $1,500 Implemented
NC0238 # 13 Y:2002 13 2002 RECOVER WASTE HEAT FROM EQUIPMENT $93,319 $15,000 Implemented
GT0732 # 04 Y:2002 04 2002 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $12,008 $2,600 Implemented
GT0732 # 05 Y:2002 05 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $342,383 $0 Implemented
LE0133 # 01 Y:2002 01 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $78,742 $0 Implemented
LE0133 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $983 $0 Implemented
LE0133 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $750 Implemented
LE0133 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,163 $0 Implemented
MS0193 # 02 Y:2001 02 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,853 $0 Implemented
MS0193 # 03 Y:2001 03 2001 DISCONNECT BALLASTS $2,179 $3,078 Implemented
MS0193 # 08 Y:2001 08 2001 PAY BILLS ON TIME TO AVOID LATE FEES $235 $100 Implemented
LE0121 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,570 $2,500 Implemented
LE0121 # 02 Y:2001 02 2001 INSULATE FEEDWATER TANK $498 $260 Implemented
LE0121 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $756 $1,000 Implemented
LE0121 # 06 Y:2001 06 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,495 $0 Implemented
LE0107 # 01 Y:2001 01 2001 IMPROVE LUBRICATION PRACTICES $272 $200 Implemented
LE0107 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $639 $0 Implemented
LE0107 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $304 $0 Implemented
LE0107 # 06 Y:2001 06 2001 USE OPTIMUM THICKNESS INSULATION $246 $350 Implemented
WI0377 # 01 Y:2000 01 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $52,550 $0 Implemented
WI0377 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,592 $8,205 Implemented
WI0377 # 08 Y:2000 08 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,629 $23,136 Implemented
WI0377 # 09 Y:2000 09 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,343 $7,200 Implemented
WI0377 # 12 Y:2000 12 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $272 $60 Implemented