IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0041 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,228 $56,789 Implemented
UM0041 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,302 $926 Implemented
GT0556 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,150 $24,310 Implemented
GT0556 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,823 $11,120 Implemented
TN0563 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,115 $701 Implemented
TN0563 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,625 $1,540 Implemented
TN0563 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $303 $170 Implemented
TN0563 # 08 Y:1995 08 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,313 $0 Implemented
TN0563 # 12 Y:1995 12 1995 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $11,700 $10,200 Implemented
TN0563 # 02 Y:1995 02 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $816 $134 Implemented
TN0563 # 01 Y:1995 01 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $8,547 $16,638 Implemented
TN0563 # 03 Y:1995 03 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $3,191 $0 Implemented
NC0055 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $658 $3,360 Implemented
NC0055 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,431 $480 Implemented
NC0055 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,521 $1,200 Implemented
NC0054 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,092 $360 Implemented
NC0054 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,438 $5,749 Implemented
ME0155 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,904 $20,000 Implemented
ME0155 # 03 Y:1995 03 1995 CLOSE OFF UNNEEDED STEAM LINES $1,120 $200 Implemented
ME0155 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $952 $350 Implemented
ME0155 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $907 $400 Implemented
ME0155 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,097 $20,385 Implemented
ME0155 # 06 Y:1995 06 1995 USE OPTIMUM THICKNESS INSULATION $772 $130 Implemented
MA0326 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,293 $2,500 Implemented
MA0326 # 04 Y:1995 04 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,604 $4,305 Implemented