IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

902

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0116 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,226 $12,000 Implemented
DL0116 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,087 $22,969 Not Implemented
DL0116 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,316 $8,800 Not Implemented
DL0116 # 11 Y:2013 11 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,741 $800 Not Implemented
DL0116 # 12 Y:2013 12 2013 INSULATE BARE EQUIPMENT $596 $500 Implemented
DL0116 # 13 Y:2013 13 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,946 $5,250 Not Implemented
MA0671 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $36,635 $200,000 Not Implemented
MA0671 # 02 Y:2011 02 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,780 $3,550 Implemented
MA0671 # 03 Y:2011 03 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,556 $15,000 Not Implemented
MA0671 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,328 $2,220 Not Implemented
MA0671 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $740 $200 Implemented
TT0067 # 01 Y:2011 01 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $303,919 $125,000 Not Implemented
AM0583 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,970 $26,490 Implemented
AM0583 # 02 Y:2010 02 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,360 $0 Implemented
AM0583 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,447 $680 Implemented
AM0583 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $500 Implemented
AM0583 # 05 Y:2010 05 2010 PAY UTILITY BILLS ON TIME $479 $0 Implemented
AM0583 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $210 $10 Implemented
AM0583 # 07 Y:2010 07 2010 USE SYNTHETIC LUBRICANT $130 $0 Implemented
NC0407 # 01 Y:2010 01 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,128 $60,000 Implemented
NC0407 # 02 Y:2010 02 2010 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $35,567 $200,000 Not Implemented
NC0407 # 03 Y:2010 03 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,606 $1,000 Implemented
NC0407 # 04 Y:2010 04 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,147 $42,000 Implemented
NC0407 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $350 $50 Not Implemented
NC0407 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $6,897 Implemented