IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

269

matching recommendations
Reset
SIC 2295 Coated Fabrics, Not Rubberized
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0235 # 08 Y:1995 08 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $368 $875 Not Implemented
WI0235 # 09 Y:1995 09 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $121 $0 Not Implemented
WI0235 # 10 Y:1995 10 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,200 $0 Not Implemented
MA0249 # 01 Y:1992 01 1992 BURN A LESS EXPENSIVE GRADE OF FUEL $20,512 $0 Not Implemented
MA0249 # 02 Y:1992 02 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $10,171 $100 Implemented
MA0249 # 03 Y:1992 03 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,808 $6,580 Implemented
MA0249 # 04 Y:1992 04 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,251 $5,020 Not Implemented
MA0249 # 05 Y:1992 05 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,845 $600 Implemented
MA0249 # 06 Y:1992 06 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,480 $2,854 Implemented
MA0249 # 07 Y:1992 07 1992 REPAIR AND ELIMINATE STEAM LEAKS $1,312 $300 Implemented
MA0249 # 08 Y:1992 08 1992 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $742 $1,668 Implemented
MA0249 # 09 Y:1992 09 1992 IMPROVE LUBRICATION PRACTICES $750 $0 Not Implemented
MA0249 # 10 Y:1992 10 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $512 $77 Not Implemented
RU0097 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $631 $0 Implemented
RU0097 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,503 $291 Not Implemented
RU0097 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,103 $302 Implemented
RU0097 # 04 Y:1990 04 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $218 $171 Implemented
RU0097 # 05 Y:1990 05 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,004 $0 Not Implemented
RU0097 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,450 $0 Implemented
RU0097 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,951 $500 Implemented
RU0097 # 08 Y:1990 08 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $38,171 $13,250 Not Implemented
RU0097 # 09 Y:1990 09 1990 INSULATE BARE EQUIPMENT $1,424 $625 Implemented
UD0312 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,153 $2,400 Implemented
UD0312 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,262 $7,825 Implemented
UD0312 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,422 $2,000 Implemented