Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
104
matching recommendationsSIC | 2298 | Cordage And Twine |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2419 # 01 Y:2024 | 01 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $6,299 | $17,640 | n/a |
LS2419 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $38,616 | $514,800 | n/a |
LS2419 # 04 Y:2024 | 04 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $56,850 | $580,000 | n/a |
LS2419 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,609 | $51,689 | n/a |
LS2419 # 02 Y:2024 | 02 | 2024 | USE OTHER WASTE CONCENTRATION METHODS | $50,241 | $154,466 | n/a |
UW2301 # 05 Y:2023 | 05 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,590 | $77,405 | Not Implemented |
UW2301 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $729 | $0 | Not Implemented |
UW2301 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $82 | $344 | Implemented |
UW2301 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,976 | $295 | Not Implemented |
UW2301 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,523 | $16,133 | Implemented |
OK0784 # 09 Y:2009 | 09 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $858 | $990 | Implemented |
OK0784 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,788 | $0 | Implemented |
OK0784 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,104 | $0 | Implemented |
OK0784 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $362 | $1,013 | Not Implemented |
OK0784 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $26,522 | $23,859 | Implemented |
OK0784 # 01 Y:2009 | 01 | 2009 | INSULATE BARE EQUIPMENT | $32,802 | $10,627 | Implemented |
OK0784 # 03 Y:2009 | 03 | 2009 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $11,003 | $0 | Not Implemented |
OK0784 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $1,600 | $620 | Not Implemented |
OK0784 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $888 | $1,098 | Not Implemented |
LL0278 # 02 Y:2007 | 02 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $14,779 | $1,384 | Not Implemented |
LL0278 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,656 | $10,860 | Implemented |
LL0278 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,744 | $1,050 | Implemented |
LL0278 # 09 Y:2007 | 09 | 2007 | INSULATE BARE EQUIPMENT | $1,240 | $428 | Not Implemented |
LL0278 # 11 Y:2007 | 11 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $203 | $120 | Implemented |
LL0278 # 06 Y:2007 | 06 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,920 | $1,147 | Implemented |