IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
SIC 2298 Cordage And Twine
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0278 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $1,050 Implemented
LL0278 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $1,696 $912 Implemented
LL0278 # 09 Y:2007 09 2007 INSULATE BARE EQUIPMENT $1,240 $428 Not Implemented
LL0278 # 10 Y:2007 10 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $583 $668 Not Implemented
LL0278 # 11 Y:2007 11 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $203 $120 Implemented
LL0155 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $839 $75 Not Implemented
LL0155 # 07 Y:2003 07 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $25,317 $13,100 Implemented
LL0155 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $518 $364 Implemented
LL0155 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $712 $756 Not Implemented
LL0155 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $1,265 $262 Implemented
LL0155 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,929 $975 Implemented
LL0155 # 01 Y:2003 01 2003 REPLACE BOILER $17,740 $33,000 Not Implemented
LL0155 # 08 Y:2003 08 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,006 $186 Implemented
LE0133 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $983 $0 Implemented
LE0133 # 01 Y:2002 01 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $78,742 $0 Implemented
LE0133 # 02 Y:2002 02 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $1,298 $6,000 Not Implemented
LE0133 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $349 $750 Not Implemented
LE0133 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $750 Implemented
LE0133 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,163 $0 Implemented
NC0055 # 07 Y:1995 07 1995 MINIMIZE WATER USAGE $8,114 $10,000 Not Implemented
NC0055 # 02 Y:1995 02 1995 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $144,508 $638,000 Not Implemented
NC0055 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,521 $1,200 Implemented
NC0055 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $658 $3,360 Implemented
NC0055 # 06 Y:1995 06 1995 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $56,724 $55,000 Not Implemented
NC0055 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,143 $28,000 Not Implemented