IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

182

matching recommendations
Reset
SIC 2299 Textile Goods, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0188 # 05 Y:2000 05 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $3,746 $3,344 Implemented
WV0188 # 06 Y:2000 06 2000 DISCONNECT BALLASTS $5,102 $1,527 Implemented
WV0188 # 09 Y:2000 09 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $708 $693 Implemented
WV0188 # 10 Y:2000 10 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,187 $0 Implemented
MA0457 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,685 $33,280 Implemented
MA0457 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,246 $4,225 Implemented
MA0457 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,317 $2,000 Implemented
WV0155 # 01 Y:1998 01 1998 REDUCE VENTILATION AIR $1,704 $708 Implemented
WV0155 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $24,472 $4,450 Implemented
WV0155 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,598 $1,280 Implemented
WV0155 # 07 Y:1998 07 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $712 $670 Implemented
WV0155 # 08 Y:1998 08 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $75 $0 Implemented
MA0412 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,681 $7,454 Implemented
MA0412 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,088 $323 Implemented
MA0412 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,686 $3,400 Implemented
MA0412 # 05 Y:1998 05 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $925 $403 Implemented
MA0407 # 02 Y:1998 02 1998 $5,468 $100 Implemented
MA0407 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $145 $52 Implemented
OR0293 # 01 Y:1997 01 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $361 $500 Implemented
OR0293 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,210 $4,665 Implemented
OR0293 # 04 Y:1997 04 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $149,760 $238,000 Implemented
OR0293 # 05 Y:1997 05 1997 $1,000 $0 Implemented
OR0293 # 06 Y:1997 06 1997 $48,900 $70,000 Implemented
ME0214 # 01 Y:1997 01 1997 $24,500 $7,500 Implemented
ME0214 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,079 $31,719 Implemented