IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

355

matching recommendations
Reset
SIC 2299 Textile Goods, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0188 # 01 Y:2000 01 2000 INSTALL SET-BACK TIMERS $318 $28 Implemented
WV0188 # 06 Y:2000 06 2000 DISCONNECT BALLASTS $5,102 $1,527 Implemented
MA0457 # 01 Y:2000 01 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $113,982 $160,909 Not Implemented
MA0457 # 02 Y:2000 02 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $55,054 $400,000 Not Implemented
MA0457 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,685 $33,280 Implemented
MA0457 # 04 Y:2000 04 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,519 $9,750 Not Implemented
MA0457 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,246 $4,225 Implemented
MA0457 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,317 $2,000 Implemented
OD0138 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,813 $45,982 Not Implemented
OD0138 # 02 Y:1999 02 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,361 $1,100 Not Implemented
OD0138 # 03 Y:1999 03 1999 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $858 $4,020 Not Implemented
OD0138 # 04 Y:1999 04 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,382 $400 Not Implemented
OD0138 # 05 Y:1999 05 1999 SELL COMBUSTIBLE WASTE $15,574 $0 Not Implemented
OD0138 # 06 Y:1999 06 1999 PAY BILLS ON TIME TO AVOID LATE FEES $325 $0 Not Implemented
WV0155 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,598 $1,280 Implemented
WV0155 # 01 Y:1998 01 1998 REDUCE VENTILATION AIR $1,704 $708 Implemented
WV0155 # 02 Y:1998 02 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,108 $4,432 Not Implemented
WV0155 # 03 Y:1998 03 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $8,776 $10,800 Not Implemented
WV0155 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,575 $289 Not Implemented
WV0155 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $24,472 $4,450 Implemented
WV0155 # 07 Y:1998 07 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $712 $670 Implemented
WV0155 # 08 Y:1998 08 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $75 $0 Implemented
WV0155 # 09 Y:1998 09 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $20,520 $23,298 Not Implemented
WV0155 # 10 Y:1998 10 1998 UTILIZE OUTSIDE CONTRACTING $5,808 $0 Not Implemented
MA0412 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,681 $7,454 Implemented