IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 2299 Textile Goods, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0267 # 02 Y:2003 02 2003 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $6,222 $9,225 Not Implemented
NC0267 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,018 $9,911 Not Implemented
NC0267 # 04 Y:2003 04 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,686 $700 Implemented
NC0267 # 05 Y:2003 05 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,004 $12,000 Implemented
NC0267 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $410 $100 Implemented
NC0267 # 07 Y:2003 07 2003 RECOVER AND REUSE COOLING WATER $64,159 $0 Not Implemented
NC0267 # 01 Y:2003 01 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $869 $0 Not Implemented
WI0447 # 03 Y:2003 03 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,071 $2,000 Not Implemented
WI0447 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,938 $2,600 Implemented
WI0447 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $381 $740 Not Implemented
WI0447 # 02 Y:2003 02 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $6,058 $4,500 Implemented
WI0447 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $62,019 $150,000 Not Implemented
TA0056 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $770 $0 Implemented
TA0056 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $880 $325 Implemented
TA0056 # 03 Y:2003 03 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,726 $0 Implemented
TA0056 # 02 Y:2003 02 2003 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $13,500 $1,075 Not Implemented
TA0056 # 01 Y:2003 01 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $190,000 $141,875 Not Implemented
TA0056 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $1,128 Implemented
WV0258 # 13 Y:2003 13 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,945 $250 Implemented
WV0258 # 12 Y:2003 12 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,489 $200 Implemented
WV0258 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $7,852 $2,734 Implemented
WV0258 # 10 Y:2003 10 2003 USE OPTIMUM THICKNESS INSULATION $3,010 $518 Not Implemented
WV0258 # 09 Y:2003 09 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,163 $220 Implemented
WV0258 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,129 $525 Implemented
WV0258 # 07 Y:2003 07 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,432 $1,000 Implemented