Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,201

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0246 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,731 $338 Implemented
UU0246 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,628 $3,000 Implemented
UU0246 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $8,970 $42,406 Implemented
UU0246 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $3,514 $9,000 Implemented
UU0246 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $123 Implemented
LE0541 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $890 $2,400 Implemented
LE0541 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,461 $100 Implemented
LE0541 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,846 $4,210 Implemented
UU0211 # 04 Y:2023 04 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,351 $26,250 Implemented
UU0211 # 01 Y:2023 01 2023 REPLACE BOILER $24,600 $111,300 Implemented
SF0588 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $8,477 $5,558 Implemented
SF0588 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $621 $1,515 Implemented
SF0588 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,344 $4,967 Implemented
MU0014 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,023 $0 Implemented
MU0014 # 08 Y:2022 08 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $109 $0 Implemented
MU0014 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,680 $4,307 Implemented
DL0199 # 02 Y:2021 02 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,784 $0 Implemented
DL0199 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,657 $1,514 Implemented
DL0199 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,226 $0 Implemented
DL0199 # 13 Y:2021 13 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,579 $2,106 Implemented
LS2105 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,367 $675 Implemented
LS2105 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,466 $100 Implemented
LS2105 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,725 $9,408 Implemented
LS2105 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $133 $580 Implemented
SF0562 # 06 Y:2020 06 2020 RECOVER WASTE HEAT FROM EQUIPMENT $12,365 $55,965 Implemented