IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,196

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0262 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,702 $0 Implemented
TN0262 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $44 $0 Implemented
ST0039 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,649 $220 Implemented
ST0039 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,489 $24 Implemented
ST0039 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $61 $60 Implemented
ST0039 # 05 Y:1985 05 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $207 $0 Implemented
ST0039 # 06 Y:1985 06 1985 USE COMPRESSOR AIR FILTERS $136 $80 Implemented
ST0039 # 10 Y:1985 10 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $691 $537 Implemented
ST0039 # 11 Y:1985 11 1985 INSULATE BARE EQUIPMENT $1,068 $944 Implemented
ST0039 # 12 Y:1985 12 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $171 $74 Implemented
AT0009 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,849 $2,615 Implemented
AT0009 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,328 $300 Implemented
AT0009 # 04 Y:1985 04 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $25,352 $17,610 Implemented
AT0009 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,759 $13,543 Implemented
LT0023 # 02 Y:1985 02 1985 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $18,120 $45,000 Implemented
LT0023 # 03 Y:1985 03 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,435 $624 Implemented
LT0023 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,636 $762 Implemented
ST0027 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $674 $537 Implemented
ST0027 # 09 Y:1985 09 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $467 $150 Implemented
ST0027 # 10 Y:1985 10 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $2,513 $417 Implemented
KU0159 # 01 Y:1985 01 1985 INSULATE BARE EQUIPMENT $1,719 $500 Implemented
KU0159 # 02 Y:1985 02 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,530 $20,000 Implemented
KU0159 # 03 Y:1985 03 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $799 $1,500 Implemented
KU0159 # 04 Y:1985 04 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,842 $2,505 Implemented
KU0159 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $115 $0 Implemented