IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0795 # 05 Y:2020 05 2020 PAY UTILITY BILLS ON TIME $1,105 $0 Implemented
AM0795 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $284 Not Implemented
AM0795 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,710 $18 Not Implemented
AM0795 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,426 $1,000 Implemented
AM0795 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $3,600 $35 Implemented
TR0021 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $183 $210 Not Implemented
TR0021 # 02 Y:2020 02 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $35,728 $7,275 Implemented
TR0021 # 03 Y:2020 03 2020 USE MECHANICAL STRIPPING METHODS $2,731 $666 Implemented
TR0021 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,409 $0 Not Implemented
AM0674 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,185 $500 Implemented
AM0674 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $430 $0 Not Implemented
AM0674 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $550 $275 Implemented
AM0674 # 07 Y:2015 07 2015 INSTALL SKYLIGHTS $625 $970 Not Implemented
AM0674 # 06 Y:2015 06 2015 INSULATE FEEDWATER TANK $950 $140 Not Implemented
AM0674 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,420 $5 Not Implemented
AM0674 # 03 Y:2015 03 2015 REPAIR OR REPLACE STEAM TRAPS $2,350 $440 Implemented
AM0674 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $4,070 $3,950 Not Implemented
AM0674 # 01 Y:2015 01 2015 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $23,350 $24,500 Not Implemented
AM0452 # 01 Y:2004 01 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $120,000 $3,700 Not Implemented
AM0452 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43,054 $139,284 Implemented
AM0452 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,600 $21,200 Implemented
AM0452 # 06 Y:2004 06 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $4,740 $0 Not Implemented
AM0452 # 05 Y:2004 05 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,840 $0 Not Implemented
AM0452 # 04 Y:2004 04 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $13,600 $2,300 Implemented
AM0452 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,400 $500 Implemented