IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0021 # 03 Y:2001 03 2001 MODIFY STARTUP/SHUTDOWN TIMES $3,634 $113 Not Implemented
MI0021 # 01 Y:2001 01 2001 METER WASTE WATER $13,904 $3,650 Not Implemented
MI0006 # 06 Y:2001 06 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,215 $1,126 Not Implemented
MI0006 # 01 Y:2001 01 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,105 $2,513 Not Implemented
MI0006 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,467 $333 Not Implemented
MI0006 # 03 Y:2001 03 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $16,244 $2,084 Not Implemented
MI0006 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,608 $312 Not Implemented
MI0006 # 05 Y:2001 05 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $22,646 $7,000 Not Implemented
MI0006 # 07 Y:2001 07 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $120,000 $44,200 Not Implemented
UF0103 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,757 $4,278 Not Implemented
UF0103 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,740 $750 Implemented
UF0103 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $251 $648 Implemented
UF0103 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $469 $720 Not Implemented
UF0103 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,361 $36,877 Implemented
UF0103 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,819 $6,009 Not Implemented
UF0016 # 04 Y:1992 04 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,664 $7,280 Not Implemented
UF0016 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $186 $3,965 Implemented
UF0016 # 05 Y:1992 05 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,151 $6,110 Implemented
UF0017 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,928 $669 Not Implemented
UF0017 # 05 Y:1992 05 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,192 $8,374 Not Implemented
UF0017 # 04 Y:1992 04 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,712 $4,000 Not Implemented
UF0017 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $60 $870 Not Implemented
UF0017 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $2,525 $14,685 Not Implemented
UF0019 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,174 $2,000 Not Implemented
UF0019 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $599 $9,321 Not Implemented