IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,394

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0066 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,752 $26,520 Not Implemented
KG0066 # 03 Y:1996 03 1996 USE SYNTHETIC LUBRICANT $1,309 $0 Not Implemented
KG0066 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,254 $1,530 Not Implemented
KG0066 # 05 Y:1996 05 1996 AIR CONDITION ONLY SPACE NECESSARY $2,569 $1,150 Not Implemented
KG0066 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $751 $130 Not Implemented
KG0066 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $490 $300 Not Implemented
KG0066 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $485 $353 Not Implemented
KG0066 # 09 Y:1996 09 1996 REDUCE SCRAP PRODUCTION $76,927 $0 Not Implemented
KG0066 # 10 Y:1996 10 1996 RECOVER AND REUSE WASTE MATERIAL $3,991 $2,344 Not Implemented
GT0592 # 01 Y:1996 01 1996 INSTALL TIMERS AND/OR THERMOSTATS $12,080 $2,600 Implemented
GT0592 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,650 $34,000 Implemented
GT0592 # 03 Y:1996 03 1996 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,750 $400 Not Implemented
GT0592 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $720 $3,730 Not Implemented
GT0592 # 05 Y:1996 05 1996 OPTIMIZE PLANT POWER FACTOR $6,620 $11,100 Not Implemented
GT0591 # 01 Y:1996 01 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,220 $3,800 Not Implemented
GT0591 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,290 $15,000 Not Implemented
GT0591 # 03 Y:1996 03 1996 INCREASE AMOUNT OF CONDENSATE RETURNED $21,690 $11,410 Not Implemented
GT0591 # 04 Y:1996 04 1996 COVER OPEN TANKS $2,320 $1,200 Implemented
GT0591 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,120 $200 Implemented
GT0591 # 06 Y:1996 06 1996 REPAIR OR REPLACE STEAM TRAPS $7,900 $800 Not Implemented
GT0591 # 07 Y:1996 07 1996 METER WASTE WATER $17,050 $1,800 Not Implemented
GT0591 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,900 $50,750 Not Implemented
GT0591 # 09 Y:1996 09 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,520 $1,020 Not Implemented
GT0591 # 10 Y:1996 10 1996 OPTIMIZE PLANT POWER FACTOR $8,510 $13,400 Not Implemented
BD0062 # 01 Y:1996 01 1996 INSTALL OCCUPANCY SENSORS $2,266 $2,400 Not Implemented