IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,394

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0147 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $219 $20 n/a
UL0147 # 05 Y:1996 05 1996 TREAT AND REUSE RINSE WATERS $14,800 $10,500 n/a
UL0147 # 06 Y:1996 06 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $60,500 $8,000 n/a
UL0147 # 07 Y:1996 07 1996 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $4,000 $5,400 n/a
SD0138 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,552 $14,760 Not Implemented
SD0138 # 02 Y:1996 02 1996 USE POWER DURING OFF-PEAK PERIODS $37,136 $0 Not Implemented
SD0138 # 03 Y:1996 03 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,627 $1,495 Not Implemented
SD0138 # 04 Y:1996 04 1996 INSULATE BARE EQUIPMENT $1,130 $284 Not Implemented
SD0138 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,848 $13,338 Not Implemented
SD0138 # 06 Y:1996 06 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $18,160 $15,165 Not Implemented
SD0138 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $2,449 $1,600 Not Implemented
SD0138 # 08 Y:1996 08 1996 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE $18,430 $7,200 Not Implemented
SD0138 # 09 Y:1996 09 1996 RECOVER AND REUSE WASTE MATERIAL $3,500 $0 Not Implemented
SD0138 # 10 Y:1996 10 1996 RECOVER AND REUSE WASTE MATERIAL $1,200 $500 Not Implemented
KG0058 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,449 $16,500 Implemented
KG0058 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,585 $6,796 Implemented
KG0058 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,147 $19,100 Not Implemented
KG0058 # 04 Y:1996 04 1996 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,489 $60 Not Implemented
KG0058 # 05 Y:1996 05 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,022 $12,000 Implemented
KG0058 # 06 Y:1996 06 1996 USE SYNTHETIC LUBRICANT $2,937 $0 Implemented
KG0058 # 07 Y:1996 07 1996 RECOVER AND REUSE WASTE MATERIAL $8,771 $0 Implemented
KG0058 # 08 Y:1996 08 1996 RECOVER AND REUSE WASTE MATERIAL $4,456 $1,500 Implemented
MS0043 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,215 $9,659 Not Implemented
MS0043 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $1,055 $872 Not Implemented
MS0043 # 03 Y:1995 03 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $221 $0 Implemented