Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
98
matching recommendationsSIC | 23 | Apparel And Other Textile Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0795 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $710 | $284 | Not Implemented |
AM0795 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,426 | $1,000 | Implemented |
AM0795 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,710 | $18 | Not Implemented |
AM0795 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,600 | $35 | Implemented |
AM0795 # 05 Y:2020 | 05 | 2020 | PAY UTILITY BILLS ON TIME | $1,105 | $0 | Implemented |
TR0021 # 02 Y:2020 | 02 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $35,728 | $7,275 | Implemented |
TR0021 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,409 | $0 | Not Implemented |
TR0021 # 01 Y:2020 | 01 | 2020 | INSTALL OCCUPANCY SENSORS | $183 | $210 | Not Implemented |
TR0021 # 03 Y:2020 | 03 | 2020 | USE MECHANICAL STRIPPING METHODS | $2,731 | $666 | Implemented |
AM0674 # 06 Y:2015 | 06 | 2015 | INSULATE FEEDWATER TANK | $950 | $140 | Not Implemented |
AM0674 # 03 Y:2015 | 03 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $2,350 | $440 | Implemented |
AM0674 # 05 Y:2015 | 05 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,185 | $500 | Implemented |
AM0674 # 02 Y:2015 | 02 | 2015 | OPTIMIZE PLANT POWER FACTOR | $4,070 | $3,950 | Not Implemented |
AM0674 # 01 Y:2015 | 01 | 2015 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $23,350 | $24,500 | Not Implemented |
AM0674 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,420 | $5 | Not Implemented |
AM0674 # 09 Y:2015 | 09 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $430 | $0 | Not Implemented |
AM0674 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $550 | $275 | Implemented |
AM0674 # 07 Y:2015 | 07 | 2015 | INSTALL SKYLIGHTS | $625 | $970 | Not Implemented |
AM0452 # 08 Y:2004 | 08 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $980 | $0 | Implemented |
AM0452 # 04 Y:2004 | 04 | 2004 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $13,600 | $2,300 | Implemented |
AM0452 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,400 | $500 | Implemented |
AM0452 # 09 Y:2004 | 09 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $43,054 | $139,284 | Implemented |
AM0452 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,600 | $21,200 | Implemented |
AM0452 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $120,000 | $3,700 | Not Implemented |
AM0452 # 02 Y:2004 | 02 | 2004 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $67,000 | $100,000 | Implemented |