IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations

126

matching recommendations
Reset
SIC 2311 Men's and Boys' Suits, Coats, and Overcoats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1905 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,079 $1,308 Implemented
UK1905 # 07 Y:2019 07 2019 USE PHOTOCELL CONTROLS $180 $170 Implemented
UK1905 # 11 Y:2019 11 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,240 $26,497 Implemented
UK1905 # 12 Y:2019 12 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $96 $31 Implemented
UK1905 # 14 Y:2019 14 2019 OPTIMIZE PLANT POWER FACTOR $1,585 $3,010 Not Implemented
UK1905 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $320 $0 Implemented
UK1905 # 06 Y:2019 06 2019 RECOVER WASTE HEAT FROM EQUIPMENT $1,464 $0 Implemented
UK1905 # 13 Y:2019 13 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $33 Implemented
UK1905 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $260 $825 Implemented
UK1905 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $1,919 $1,460 Implemented
UK1905 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,436 $2,510 Implemented
UK1905 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,090 $640 Implemented
UK1905 # 09 Y:2019 09 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,774 $941 Implemented
UK1905 # 10 Y:2019 10 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $63 $50 Implemented
DL0033 # 01 Y:2009 01 2009 USE MINIMUM STEAM OPERATING PRESSURE $1,091 $0 Implemented
DL0033 # 08 Y:2009 08 2009 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $6,433 $26,980 Implemented
DL0033 # 07 Y:2009 07 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $150 Implemented
DL0033 # 06 Y:2009 06 2009 UPGRADE CONTROLS ON COMPRESSORS $3,596 $12,500 Not Implemented
DL0033 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $80 Implemented
DL0033 # 04 Y:2009 04 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,737 $10,000 Implemented
DL0033 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,789 $16,100 Implemented
DL0033 # 02 Y:2009 02 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $5,409 $9,300 Implemented
LE0153 # 01 Y:2003 01 2003 ADD AREA LIGHTING SWITCHES $3,181 $1,375 Not Implemented
LE0153 # 02 Y:2003 02 2003 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,007 $4,000 Not Implemented
LE0153 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,189 $750 Implemented