IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 2321 Men's and Boys' Shirts, Except Work Shirts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0264 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $454 $630 Implemented
NC0264 # 10 Y:2003 10 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,393 $350 Implemented
NC0264 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $152 $627 Implemented
NC0195 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,306 $300 Implemented
NC0195 # 01 Y:2000 01 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $150,957 $214,000 Implemented
NC0195 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,839 $3,180 Implemented
NC0195 # 03 Y:2000 03 2000 DISCONNECT BALLASTS $7,600 $6,350 Implemented
MS0077 # 03 Y:1997 03 1997 SHUT OFF PILOTS IN STANDBY EQUIPMENT $480 $20 Implemented
MS0072 # 04 Y:1996 04 1996 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $3,884 $0 Implemented
MS0072 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,689 $31,313 Implemented
TN0434 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $173 $410 Implemented
TN0434 # 07 Y:1991 07 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,785 $0 Implemented
TN0434 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35 $128 Implemented
TN0434 # 01 Y:1991 01 1991 USE MINIMUM STEAM OPERATING PRESSURE $1,745 $2,550 Implemented
TN0434 # 03 Y:1991 03 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,504 $3,650 Implemented
TN0434 # 04 Y:1991 04 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $117 $115 Implemented
TN0434 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,163 $240 Implemented
MA0210 # 01 Y:1991 01 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $300 $136 Implemented
MA0210 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $191 $350 Implemented
MA0210 # 03 Y:1991 03 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $651 $2,764 Implemented
MA0210 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $47 Implemented
MA0210 # 05 Y:1991 05 1991 DIRECT WARMEST AIR TO COMBUSTION INTAKE $151 $405 Implemented
MA0210 # 06 Y:1991 06 1991 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $1,286 $2,375 Implemented
GT0429 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $150 $1,130 Implemented
GT0429 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,175 $1,600 Implemented